In order to bring you the best possible user experience, this site uses Javascript. If you are seeing this message, it is likely that the Javascript option in your browser is disabled. For optimal viewing of this site, please ensure that Javascript is enabled for your browser.
Home / Community / Sun Power for Schools / Baldwin High School
Community

Baldwin High School

The Sun Power for Schools program reached a milestone on September 30, 1997 when MECO installed its first photovoltaic (PV) system on the roof of the multipurpose classroom building at Baldwin High School.

System details:

 • 

One kilowatt (kW) rated peak

 • 

Four 4x6 foot panels, weighing 110 pounds each (Manufacturer: ASE, Type: ASE-300-DB/50-285)

 • 

DC and AC disconnection switches

 • 

One kW AES inverter to convert DC current to AC

 • 

Data acquisition system (Data collection can be monitored and analyzed by students as part of integrated renewable energy lessons.)


Baldwin HS solar panels

As a MECO customer, you can help more schools participate in the Sun Power for Schools program. Even as little as $1 or $2 a month can help a lot.

So what are you waiting for? Sign up to be a Sun Power partner today! For more information or a sign up card, call 841-8461 (Maui), 553-3234 (Molokai), or 565-6445 (Lanai).



Collected Sun Power Data:
No Data Available at this time