Baldwin High School
The Sun Power for Schools program reached a milestone on September 30, 1997 when MECO installed its first photovoltaic (PV) system on the roof of the multipurpose classroom building at Baldwin High School.
System details:
|
•
|
One kilowatt (kW) rated peak
|
|
•
|
Four 4x6 foot panels, weighing 110 pounds each (Manufacturer: ASE, Type: ASE-300-DB/50-285)
|
|
•
|
DC and AC disconnection switches
|
|
•
|
One kW AES inverter to convert DC current to AC
|
|
•
|
Data acquisition system (Data collection can be monitored and analyzed by students as part of integrated renewable energy lessons.)
|

As a MECO customer, you can help more schools participate in the Sun Power for Schools program. Even as little as $1 or $2 a month can help a lot.
So what are you waiting for? Sign up to be a Sun Power partner today! For more information or a sign up card, call 841-8461 (Maui), 553-3234 (Molokai), or 565-6445 (Lanai).
Collected Sun Power Data:
No Data Available at this time
|